By Asatron on Monday, 12 September 2022
Posted in Pier Maintenance
Replies 0
Likes 0
Views 444
Votes 0

We are travelling to Spain for a maintenance visit on the 15th October for around 10 days, so piers will be up and down a little over this time as we get through the list of work.

The main work being carried out:

  • Pier-1 collimation tweak, new calibration frames in preparation for 1x1 binning
  • Pier-2 new 10 micron Gm2000 mount plus general maintenance, new calibration frames in preparation for 1x1 binning
  • Pier-5 flight collimation tweak
  • Pier-6 flight collimation tweak
  • Pier-8 sort secondary spacing out & general maintenance
  • Pier-9 fit new focuser & camera
  • Pier-10 service the Paramount ME & tweak collimation
  • Pier-14 Sort out the ZWO obligatory tilt issue out once and for all
  • Fit a customers new Hosting setup
  • Prepare all piers for upcoming winter season
  • Fit new flat panels where possible

Steve & Pete

View Full Post