We are travelling to Spain for a maintenance visit on the 15th October for around 10 days, so piers will be up and down a little over this time as we get through the list of work.
The main work being carried out:
- Pier-1 collimation tweak, new calibration frames in preparation for 1x1 binning
- Pier-2 new 10 micron Gm2000 mount plus general maintenance, new calibration frames in preparation for 1x1 binning
- Pier-5 flight collimation tweak
- Pier-6 flight collimation tweak
- Pier-8 sort secondary spacing out & general maintenance
- Pier-9 fit new focuser & camera
- Pier-10 service the Paramount ME & tweak collimation
- Pier-14 Sort out the ZWO obligatory tilt issue out once and for all
- Fit a customers new Hosting setup
- Prepare all piers for upcoming winter season
- Fit new flat panels where possible
Steve & Pete
Please ignore my dylexia wherever possible, just be thankful I can control my Tourettes ;)
Things to do, so little time!
Steve
Roboscopes Tea Boy